Language

Wax thermostatic sensor element

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-17 03:01

  • Browse the number:

    157

Send an inquiries
Company Profile
Zhejiang Taizhou Triunion Co. Ltd
By certification [File Integrity]
Contact:

triunion(Ms.)  

Telephone:

Area:

Beijing

Address:

No.535, Shifu Rd, Jiaojiang Taizhou, Zhejiang, China, Taizhou, Zhejiang, China (318000)

Website:

http://triunion.jinhaida.net/

Product Details
Model Number: EN1111 TU-CGQ-011 Brand Name: TU Key Specifications/Special Features: Operation principle:Havebeen sealed in shell body induces expansion by a given temperature and inner rubber seal part drives its handspike to move under expansion pressure to realize a transition from thermal energy into mechanical energyBrings an upward movement to its handspike and automatic control of various function are realized by use of upward movement of handspikeReturn ofhandspike is accomplished by negative load in a given returnedtemperature
  • Characteristics:
    1. Smallbody size, occupied limited space and its size and structure may be designed in according to the location where needs to work
    2. Temperature control is reliable and nicety
    3. No shaking and tranquilization in working condition
    4. Element doesn’t need special maintenance
    5. Working life islong
  • Main technical parameters:
    1. Handspike’sheight may be confirmed by drawing and technical parameters
    2. Handspike movement is relatives to the temperature range of the element and the effective distance range is from 1.5 to 25mm
    3. Temperature control range of thermostatic element is between 10 to 150°C
    4. Lag phenomenon is generally 1 to 2°C
    5. Friction of each component part and lag of the component part temperature cause a lag phenomenon
    6. Because there is a difference between up and down curve of traveling distance
    7. Loading force of thermostatic element is difference, it depends on its’ shell size
  • Shipping Information:
    • FOB Port: Ningbo
    • Lead Time: 30 - 40 days
    Main Export Markets:
    • Asia
    • North America